Product: Vinchin Backup & Recovery
Version: V6.0, V6.5
KB Number: 100101
Last Modified: 2022-02-14 13:53:28
The answer is YES.
On Vinchin Backup & Recovery, multithreaded transmission can be applied to both the VM backup and restore jobs to accelerate the processing speed of the backup and restore job sessions.
On Vinchin Backup & Recovery, 3 threads will be created for each of the backup and restore jobs. However, it is not the more threads you apply to a job the faster the processing speed will be. It depends on the overall system resources and network bandwidth can be allocated to each thread. For example, if 3 threads will gain access to all resources, adding the 4th thread will not improve the overall processing speed anymore.
60-DAY FULL-FEATURED FREE TRIAL
- No credit card required
- Get started in 10 minutes